Shijiazhuang Hutuo River Bridge Main Bridge | China

Project Description
Hutuo River Bridge, Shijiazhuang
Project Overview
A landmark mid-bearing tied arch bridge in Shijiazhuang. Our company supplied the steel arch structure, ensuring strength, precision, and durability.
Project Highlights
-
Bridge Type: Mid-bearing tied arch
-
Span: 40m + 200m + 40m
-
Structure: Steel pipe concrete truss with steel crossbeams
-
Arch Inclination: 78.568° towards center line
-
Steel Weight: 2,000 tons
Our Strengths
-
Expertise in large-scale, complex arch structures
-
Precision fabrication and assembly
-
Delivering durable and visually striking urban bridges
Result
Successfully completed a high-quality tied-arch bridge, demonstrating our capability in technically demanding steel structure projects.


.jpg)
■ The main bridge is three-span (40m + 200m + 40m) half through type basket tied arch bridge, and main arch rib is steel tube concrete truss. Steel arch weighs 2000 tons.
■ Steel beams are used between the main span arches. The arch rib inclines to the center line of the bridge axis with an inclination of 78.568 °.
■ Steel components were horizontally pre-assembled and sections were closed after arch ribs on both sides vertically turned into position.
Contact Us
Building Global Landmarks
with China's Steel Excellence













English
Français
Deutsch
Português
Español
русский
한국어
العربية
Italiano
Indonesia
Schweiz
Polski
Nederlands
ישראל - עברית
Perzisch
ไทย
日本語
ኢትዮ-አማርኛ
Việt Nam
Kiswahili
Srpski
Ελληνικά
简体中文


