Xin-dian Street Construction Project of Taiyuan City - XU21 rotary steel box Girder
.jpg)
Project Name
Taiyuan · Shanxi
ADDRESS
Taiyuan · Shanxi
STRUCTURE TYPE
Bridge structural steel

■ XU21 steel box girder bridge is located on the east-west main line of Xindian Street. The bridge goes along the route and crosses successively fen-Huang Connection line and Tai-Lan line from west to east.
■ XU21 steel box girder bridge, with a total length of 168m, is divided into 83m+85m two-span steel box girder with variable height along the road. The bottom of the bridge is about 3m from the railway height.
■ The steel box girder was assembled and welded in the north side of the railway in the direction of the railway, and then rotated 41° across the railway as a whole.
■ The total weight of the rotating structure is 8000 tons, and the construction period of the site is 45 days.
Related projects
Communicate with us
Contact UsContact Us
Building Global Landmarks
with China's Steel Excellence













English
Français
Deutsch
Português
Español
русский
한국어
العربية
Italiano
Indonesia
Schweiz
Polski
Nederlands
ישראל - עברית
Perzisch
ไทย
日本語
ኢትዮ-አማርኛ
Việt Nam
Kiswahili
Srpski
Ελληνικά
简体中文


