■ The project is located in Heping Road, Shijiazhuang city, across the Beijing-Guangzhou railway line.
 

■ Two-span steel structure continuous steel box girder, the total length of the bridge is 128.452m.
 

■ The bridge structure is designed as a single box multi-compartment steel box girder with a single box roof width of 25.5m.
 

■ The horizontal projection line of the bridge is an 800-meter radius arc + easing curve + straight section.
 

■ The transverse slope of the bridge deck changes from 3% one-way slope to 1.5% two-way slope.
 

■ After assembling in the direction of the railway, the whole construction should be carried out in a flat way, and the rotating work should be completed within 1 hour.

 