Welcome to the JINHUAN STEEL STRUCTURE

Shijiazhuang Heping Road Viaduct West Extension | China

Project Name
Shijiazhuang Heping Road Viaduct West Extension
ADDRESS
Hebei, China
STRUCTURE TYPE
Bridge structural steel

Project Description

Shijiazhuang Heping Road Elevated Road West Extension Project - China

Project Overview
A major urban infrastructure project enhancing traffic connectivity in Shijiazhuang. Our company supplied high-quality steel structures, ensuring safety, durability, and efficiency.

Project Highlights

  • Section 1 – WS & SE Ramps: 139m & 157m, 1,944 tons of steel. Large-scale ramp bridges showcasing our heavy steel fabrication capability.

  • Section 2 – Xisanzhuang Street: 50m steel-concrete composite bridge, 701 tons of steel. Precision in steel-concrete integration.

  • Section 3 – Youyi Avenue: 55m steel composite beam, 679 tons of steel. Medium-span urban bridge with high structural efficiency.

Our Strengths

  • Total steel used: 3,324 tons

  • Expertise in complex ramp and composite beam structures

  • End-to-end solution: design support, fabrication, and delivery

Result
Successfully delivered a high-quality, durable urban bridge extension, reinforcing our reputation as a leading steel structure manufacturer for large-scale infrastructure projects.

 


■ The turnround bridge of Shitai railway is 242.6 meters long and 31 degrees of turnround angle, which broke the world record of 238 meters of single spherical hinge turnround of Danyang overpass in Heze, Shandong Province.

Return to Project

Contact Us

Building Global Landmarks

with China's Steel Excellence