Coal Storage Workshop of Baotou City Sarachi Railway Special Line


■ The project is a truss structure canopy, with a building area of over 90,000 square meters.
■ The truss beam is an inverted triangle structure. The maximum length of a single truss is 127.25m, the weight is 40 tons, the height of the truss is 3-4m, the width is 3.0m, and the eaves height is 19m.
■ Interval between the two transverse columns is 48.75m and 60.5m respectively. There are closed railway lines for transporting coal between the two spans. Interval between the longitudinal columns is 15m.
■ Project highlights: during the construction process, the railway system had to keep operating and the ongoing train traffics made our field construction very challenging.
■ Installation approaches: we adopted pushing up cumulative slip construction method and hydraulic synchronous slip technology. The longest slip distance is 564m, which was the longest slip distance in Asia back then.
Contact Us
Building Global Landmarks
with China's Steel Excellence













English
Français
Deutsch
Português
Español
русский
한국어
العربية
Italiano
Indonesia
Schweiz
Polski
Nederlands
ישראל - עברית
Perzisch
ไทย
日本語
ኢትዮ-አማርኛ
Việt Nam
Kiswahili
Srpski
Ελληνικά
简体中文


